go to flash page
Selected Projects PROJECTS

:: National World War II Museum
:: Cyber Innovation Center
:: The Crescent Club
:: Whitney National Bank
:: 930 Poydras Development
::

Center for Restorative Breast Surgery

::

Gentilly High School

:: New Orleans Center for Creative Arts
:: Aquarium of the Americas
:: Harrah's Hotel
:: University of New Orleans-Housing
:: Ohr-O'Keefe Museum
:: New Orleans First Baptist Church
:: Louisiana Cancer Consortium
:: Xavier University Dorm
:: Erato Street Cruise Terminal
   
   
   
   
   
Construction Cost
$100,000,000.00

Harrah's Hotel :: New Orleans, LA

Morphy Makofsky, Inc. provided the structural and foundation design for this 26-story 450 room hotel, restaurant and nearly 6,800 square feet of meeting rooms.  The building structure consists of 27 elevated post-tensioned concrete decks.  The foundation required 700 linear feet of sheet piling and more than 4,000 cubic yards of concrete.  More than 250 steel pipe piles were also driven, some more than 200 feet deep.  The ground floor and foundations are all cast in place conventionally reinforced sections such as pile caps, elevator pits, grade beams and shear walls including all columns.  The upper floors were framed as a two way cast in place 8” thick post tensioned slab.  Some upper minor areas were designed as conventionally reinforced members such as framing around openings such as stairwells.